Before · During · After
A full bathroom transformation.
The original divided layout was opened and rebuilt with a walk-in shower, subway tile, shiplap walls, black fixtures, dark flooring, and a new vanity.
Project
Full bathroom remodel
Area
Columbus area
Stages shown
Before, during & after
Reworking both the room and the way it feels.
This project moved from an older double-vanity and tub layout through full demolition and open framing. The finished room feels brighter and more open while using strong black-and-white details throughout.
Ready for a better bathroom?